Select the expression that has a value of 13.

9 + 3 x (2 ÷ 3) + 6
(9 + 3) x 2 ÷ 3 + 6
9 − (3 x 2) ÷ 3 + 6
(9 + 3 x 2) ÷ 3 + 6

Answers

Answer 1

Answer:

9 − (3 x 2) ÷ 3 + 6 is the answer


Related Questions

Which ordered pair is a solution to the system of inequalities?
y > –x
y ≤ x + 1

A) (0,5)

B) (4,–1)

C) (1,3)

D) (–4,0)

Answers

9514 1404 393

Answer:

  B) (4,–1)

Step-by-step explanation:

A graph can help you figure this out. The point (4, -1) is in the doubly-shaded area, so is a solution to this system.

Answer: Choice B.  (4, -1)

==========================================================

Explanation:

Choice A can be ruled out because

[tex]y \le x+1\\\\5 \le 0+1\\\\5 \le 1\\\\[/tex]

which is false.

Choices C and D are similar, so they can be ruled out as well.

---------------------

Choice B is the answer because it makes both inequalities true.

If we plug the coordinates of (4,-1) into the first inequality, we get

[tex]y > -x\\\\-1 > -4[/tex]

which is a true statement because -1 is to the right of -4 on the number line.

Now try the other inequality

[tex]y \le x+1\\\\-1 \le 4+1\\\\-1 \le 5\\\\[/tex]

that's true also. So again, (4,-1) makes both inequalities true, and that's why choice B is the answer.

Surface area of the below shape

Answers

Solve all of the equations below and add all of the solutions to those equations to get your answer.

10x4x2=

8x4x2=

10x8=

(10x8)-(7x6)=

7x2x2=

6x2x2=

7x6=

Which statement explains how you could use coordinate geometry to prove that quadrilateral ABCD is a square

Answers

Answer:

Prove that all sides are congruent and that the slopes of consecutive sides are opposite reciprocals. Step-by-step explanation: In order to two segmets to be perpendicular, the slope of both lines must be opposite and reciprocals, having a 90° interception and forming a square.

find the angle and area of shaded region​

Answers

Area of shaded region = 1/2(πr²)

= 1/2(22/7×3×3)

= 99/7

= 99/7×2

= 198/7 cm^2

Thats the total area of the shaded region

Must click thanks and mark brainliest

Choose the slope-intercept form of 3x + 2y = 5.
3.
у==x
5
2.
O
O y=-x+
5
0
5
v=-x+
O
yox
5
3

Answers

Answer:

y = -3x/2 + 5/2

Step-by-step explanation:

Well, basically what you do is modify it so that y is on one side.

3x+2y = 5

2y = 5-3x

y = (5-3x)/2

y = 5/2 -3x/2

So, the answer is the second option.

Answer:

B

Step-by-step explanation:

3x + 2y = 5

Our goal is this form:

y = mx + b

- move 3x to right anc change its sign

2y = -3x + 5

- divide each member by 2

y = -3/2 x + 5/2

Please help explanation if possible

Answers

Answer:

140-5x

Step-by-step explanation:

x would be the number of minutes

for eg, after 1 min, the temperature of the steak would be 140-5(1) = 135

not sure how to explain this, but its basically the start temperature - change

Joe used a project management software package and has determined the following results for a given project.: Expected completion time of the project = 22 days Variance of project completion time = 2.77 What is the probability of completing the project over 20 days?

Answers

Answer:

0.1151 = 11.51% probability of completing the project over 20 days.

Step-by-step explanation:

Normal Probability Distribution

Problems of normal distributions can be solved using the z-score formula.

In a set with mean [tex]\mu[/tex] and standard deviation [tex]\sigma[/tex], the z-score of a measure X is given by:

[tex]Z = \frac{X - \mu}{\sigma}[/tex]

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the p-value, we get the probability that the value of the measure is greater than X.

Expected completion time of the project = 22 days.

Variance of project completion time = 2.77

This means that [tex]\mu = 22, \sigma = \sqrt{2.77}[/tex]

What is the probability of completing the project over 20 days?

This is the p-value of Z when X = 20, so:

[tex]Z = \frac{X - \mu}{\sigma}[/tex]

[tex]Z = \frac{20 - 22}{\sqrt{2.77}}[/tex]

[tex]Z = -1.2[/tex]

[tex]Z = -1.2[/tex] has a p-value of 0.1151.

0.1151 = 11.51% probability of completing the project over 20 days.

What is the distance between the following points?
WILL GIVE BRAINLIEST

Answers

Answer:

D.√85

Step-by-step explanation:

We can find the distance between two points using the distance between two points formula

Distance between two points formula:

d = √(x2 - x1)² + (y2 - y1)²

Where the x and y values are derived from the given points

We are given the two points (-2,7) and (7,9)

Using these points let's define the variables ( variables are x1, x2, y1, and y2)

Remember points are written as follows (x,y)

The x value of the first point is -2 so x1 = -2

The x value of the second point is 7 so x2 = 7

The y value of the first point is 7 so y1 = 7

The y value of the second point is 9 so y2 = 9

Now that we have defined each variable let's find the distance between the two points

We can do this by substituting the values into the formula

Formula: d = √(x2 - x1)² + (y2 - y1)²

Variables: x1 = -2, x2 = 7, y1 = 7, y2 = 9

Substitute values in formula

d = √(7 - (-2))² + (9 - 7)²

Evaluation:

The two negative signs cancel out on 7-(-2) and it changes to +7

d = √ (7+2)² + (9-7)²

Add 7+2 and subtract 9 and 7

d = √ (9)² + (2)²

Simplify exponents 9² = 81 and 2² = 4

We then have d = √ 81 + 4

Finally we add 81 and 4

We get that the distance between the two points is √85

Last year, Singh had $20,000 to invest. He invested some of it in an account that paid 7% simple interest per year, and he invested the rest in an account that paid 6% simple interest per year. After one year, he received a total of $1280 in interest. How much did he invest in each account?

Answers

Answer:

8000 and 12000 respectively

Step-by-step explanation:

Let the amount invested in first account be x and y be the amount invested in the second account.

ATQ, x+y=20000 and 1280=(7/100)*x+(6/100)*y

x=8000 and y=12000.

i have 6 one, 7 tens and 14 hundreds. what number am i?​

Answers

Answer:

Step-by-step explanation:

6×1 = 6

7×10 = 70

14×100 = 1400

6+70+1400 = 1476

Answer:

1,476

Step-by-step explanation:

I hope this helps you out! (please give me brainliest)

2/5 + 1/10= In simplest form
A. 3/15
B. 5/10
C. 1/4
D. 1/2

Answers

Answer:

1/2

Step-by-step explanation:

2/5 + 1/10

Get a common denominator of 10

2/5 * 2/2 + 1/10

4/10 + 1/10

5/10

simplify

Divide the top and bottom by 5

1/2

Answer:

[tex] \frac{1}{2} [/tex]

Answer D is correct

Step-by-step explanation:

[tex] \frac{2}{5} + \frac{1}{10} \\ \frac{2 \times 2}{5 \times 2} + \frac{1}{10} \\ \frac{4}{10} + \frac{1}{10} \\ \frac{5}{10} \\ \frac{5 \div 5}{10 \div 5} \\ = \frac{1}{2} [/tex]


4) In a clinical test with 2353 subjects, 1136 showed improvement from the treatment.

Answers

Answer:

1217

Step-by-step explanation:

Given

[tex]Subjects = 2353[/tex]

[tex]Improvement = 1136[/tex]

Required

The number that didn't improve --- missing from the question.

Let the unimproved be represented as x.

So, we have:

[tex]x + Improvement = Subjects[/tex]

Substitute known values

[tex]x + 1136 = 2353[/tex]

Solve for x

[tex]x =- 1136 + 2353[/tex]

[tex]x =1217[/tex]

A store has x packages of 4 markers and y packages of 12 markers. The store has a total of 192 markers in
stock. If there are 21 packages of 4 markers in the store, how many packages of 12 markers are there?

Answers

Sh363gdbzej3yve truly urban urge Heydyeh hdye

A rocket is fired upward with an initial velocity v of 100 meters per second. The quadratic function S(t)=-5t^2+100t can be used to find the height s of the rocket, in meters, at any time t in seconds. Find the height of the rocket 7 seconds after it takes off. During the course of its flight, after how many seconds will the rocket be at a height of 450 meters?

Answers

The rocket will be at the height of 450metres at 13.16secs and 6.84secs

Given the expression modeled by the height S(t)=-5t^2+100t where

t is the time taken by the rocket to take off

s is the height traveled by rocket

In order to find the height of the rocket 7 seconds after it takes off, we will substitute t = 7 into the equation

S(7) = -5(7)²+100(7)

S(7) = -5(49)+700

S(7) = -245+700

S(7) = 455metres

Hence the height of the rocket 7 seconds after it takes off is 455metres

Given that S = 450m, we can also get the time taken by the rocket at this height.

Recall that S(t)= -5t²+100t

450 = -5t²+100t

Rearrange

-5t²+100t - 450 = 0

5t²-100t + 450 = 0

Divide through by 5

t²-20t + 90 = 0

On factorizing above equation;

t= 10+√10 or t=10−√10

t = 10+3.1623 or 10 - 3.1623

t = 13.16 and 6.84secs

Hence the rocket will be at the height of 450metres at 13.16secs and 6.84secs

Learn more here: https://brainly.com/question/1063981

Books, and then you have 44+45x=?

Answers

Answer:

45x=-44

x=-44/45

Step-by-step explanation:

is this a free question?

If a < 0 and b > 0, then which of the following is true?
Select one:
a. a + b > 0
b. a + b < 0
c.
a + b = 0
d.
The relationship between a and b cannot be determined.

Answers

Answer:

d. The relationship between a and b cannot be determined.

Step-by-step explanation:

Given

[tex]a < 0[/tex]

[tex]b > 0[/tex]

Required

Which is true

To do this, we test each of the options using assumed values

[tex]a + b > 0[/tex]

Let:

[tex]a = -5[/tex]       [tex]b= 1[/tex]

So:

[tex]-5 + 1 > 0[/tex]

[tex]-4 > 0[/tex] --- false

[tex]a + b < 0[/tex]

Let:

[tex]a = -5[/tex]       [tex]b= 7[/tex]

So:

[tex]-5 + 7 < 0[/tex]

[tex]2 < 0[/tex] --- false

[tex]a + b = 0[/tex]

Let:

[tex]a = -5[/tex]       [tex]b= 7[/tex]

So:

[tex]-5 + 7 = 0[/tex]

[tex]2 = 0[/tex] --- false

Hence, the relationship is not specific and cannot be determined

Marie's backyard deck cost $68.29 per square meter to build. The deck is 9 meters wide and 9 meters long. How much did it cost to build the deck?

Answers

$5531.49

(9×9)×$68.29

in order for the parallelogram to be rhombus x=?

Answers

Answer:

14

Step-by-step explanation:

The angles created by the diagonals of a rhombus add up to 360 meaning each one is 90 degrees

5x+20 = 90

subtract 20 from both sides

5x = 70

divide by 5 on both sides

x=14

A superhero can fly from New York to Los Angeles in 30 minutes. The distance from New York to Los Angeles is approximately 2,450 miles.

How many miles per hour is the superhero flying?

Answers

Answer:  4900 mph

Work Shown:

30 min = 30/60 = 0.5 hours

distance = rate*time

rate = distance/time

rate = (2450 miles)/(0.5 hours)

rate = (2450/0.5) mph

rate = 4900 mph

For the sake of comparison, a typical commercial passenger jet can reach max speeds of about 600 mph.

(Use Pascal's triangle to expand each binomial. (x – 5y)^5

Answers

The n-th row in Pascal's triangle tells you the coefficients of terms in the expansion of (a + b). Starting with n = 0,

1

1 … 1

1 … 2 … 1

1 … 3 … 3 … 1

1 … 4 … 6 … 4 … 1

1 … 5 … 10 … 10 … 5 … 1

In more concrete terms, this translates to

(x - 5y)⁵ = 1 x ⁵ (-5y)⁰ + 5 x ⁴ (-5y)¹ + 10 x ³ (-5y)² + 10 x ² (-5y)³ + 5 x ¹ (-5y)⁴ + 1 x ⁰ (-5y)⁵

Simplify:

(x - 5y)⁵ = x ⁵ - 25xy + 250x ³y ² - 1250x ²y ³ + 3125xy ⁴ - 3125y

Write an expression to represent how many fourths are in 3- fourths?

Answers

Answer:

[tex]\frac{3}{4} =\frac{1}{4} (3)[/tex]

Step-by-step explanation:

like that?

Answer:

3/4

Step-by-step explanation:

Step 1:  Write an expression

A fourth is 1/4

3 fourths means 3 one forths

1/4 + 1/4 + 1/4

3/4

Answer: 3/4

PLEASEEEEEE HELPPPPPPPPP

what are the zeros for this?
f(x) = 2x^2 + 6x + 2

Answers

Answer:

-3/2 ±1/2 sqrt(5) = x

Step-by-step explanation:

f(x) = 2x^2 + 6x + 2

Set the function equal to 0

0 = 2x^2 + 6x + 2

Factor out 2

0 = 2(x^2 + 3x + 1)

Divide by 2

0 = (x^2 + 3x + 1)

Subtract 1 from each side

-1 = x^2 +3x

Complete the square by dividing the x coefficient by 2 and then squaring

(3/2)^2 = 9/4

-1 +9/4 = x^2 +3x+9/4

-4/4+9/4 = (x+3/2) ^2

5/4 = (x+3/2) ^2

Taking the square root of each side

± sqrt(5/4) = sqrt( (x+3/2) ^2)

±1/2 sqrt(5) =  (x+3/2)

Subtract 3/2 from each side

-3/2 ±1/2 sqrt(5) = x

КУ
11
10
A
9
8
7 구
6
5
4
A А
C
3
B'
2
1
B
C с
-6 -5 -4 -3 -2 -1
1 2 3 4 5 6
A ABC is dilated about the origin./
What scale factor was used to make the image A A'B'C?

Answers

Answer:

3

Step-by-step explanation:

The dilation factor is 3

If 1100 square centimeters of material is available to make a box with a square base and an open top, find the largest possible volume of the box. Round to two decimal places if necessary.

Answers

volume= a^2 * h

area= a^2+4ah

take the second equation, solve for h

4ah=1100-a^2

h=1100/4a -1/4 a now put that expression in volume equation for h.

YOu now have a volume expression as function of a.

take the derivative, set to zero, solve for a. Then put that value back into the volume equation, solve for Volume.

Cited from jiskha

What is the smallest three-digit odd numb
that can be made from 2, 8,5, 1, 3?

Answers

Answer: 101

Step-by-step explanation:

.

>
01
4
3
2
1
F
.
1
om
-3 -3 -2 -1
1
2
الم
T
X
w
Tu
TI
| חם

Answers

Could u give us a picture

A 90% confidence interval is (35 45). What is the margin of error?
A.5
B.4.5
C.9
D.10

Answers

Answer:

option a 5......

...

I hope it's correct

pls help Describe how to find the product of the two terms 3x^2y^5 and 4x^3y^7

Answers

Answer:

12 x^5y^12

Step-by-step explanation:

3x^2y^5 * 4x^3y^7

Multiply the constants

3*4 = 12

Multiply the x terms

x^2 * x^3

We know a^b* a^c = a^(b+c)

x^(2+3) = x^5

Multiply the y terms

y^6 * y^7 = y&(5+7) = y^12

Put them back together

12 x^5y^12

The answer above me is correct

At a restaurant, the bill comes to $55. You decide to leave a 12
%
tip. How much did you leave for the tip?

Answers

Answer:

$6.60

Step-by-step explanation:

12% = 0.12

12% of $55 = 0.12 x 55

=6.6

So, $6.60

Jacob bought a magazine for $2.80 and three candy bars. Write an expression for how much Jacob paid.

Answers

Answer:

total = 2.8 + 3x

x is the price of the candy bars

Other Questions
The short-run average total cost (ATC) curve of a firm will tend to be U-shaped because Group of answer choices larger firms always have lower per-unit costs than smaller firms. at low levels of output, AFC will be high, while at high levels of output, MC will be high as the result of diminishing returns. diminishing returns will be present when output is small, and high AFC will push per-unit cost to high levels when output is large. diseconomies of scale will be present at both small and large output rates. President Truman's Marshall Plan called for a military supplies for Britain and France. b substantial financial assistance to rebuild Western Europe. c economic aid for Japan. d foreign aid for Third World countries to resist communism. e an alliance to contain the Soviet Union. Which of the following statements is NOT true?A. Mutations can be harmful.B. Mutations are important to evolution.C. Mutations can be beneficial.D. Mutations are not part of evolution I need help solving this In the equation 11 - 4(x +4) = 6x, the first step is to simplify 11 - 4.TrueFalse The trma, as seen on the letter i in the word nave, tells you which of thefollowing?O A. To pronounce the letter i like the i in the English word "pitch".O B. To pronounce the a and the i together.O C. To pronounce the a and the i separately.D. To pronounce the letter i like the i in the English word "pint". Read each Original. The highlighted words are verbs or verb phrases that may be unnecessary in a more highly nominalized version. Complete the Paraphrase to create a more highly nominalized version of the Original.1.The fact that the movie bears some resemblance to the epic that has so infl uenced Western culture actually came about quite by accident, as Joel Coen told interviewers after it was released State whether the error introduced by each of the following problems would result in a high or a low value for the Cu recovery or would not affect the results. Explain. a. Some of the copper nitrate solution splashes out of the beaker in step 1. _____________ If the sum of two numbers is 4 and the sum of their squares minus three times their product is 76, find the numbers. Evaluate 5x 2y + (7x y) for x = 7 and y = 2 Is it true that resignation appears at the ----- possible time?Select one:A. mostB. terribleC. worstD. worse geometry: follow directions below for each figure. Show steps. Circle answers. find the area of each figure.HELP ASAP!!THANKS IF YOU DID!! Jenni was startled by the sudden, loud barking made by a large black dog. Every time she saw a large black dog after that, she felt anxious and jumpy. She also began to feel the same way when she say any brown, medium sized doges. This change in her conditioned response is known as ___________. what is the IUPAC name of 2NaOH(s) I really need help with this, please help me. Tm hai s c tng l 177. Nu bt s th nht i 17 n v v thm vo s th hai 25 n v th s th nht bng 2/3 s th 2 There are 5 slots, each containing the letters W, R, L, D or O. One letter is picked at random from each slot. What are the odds that the letters stored in these slots read the word WORLD? Find the dimensions of a rectangle with perimeter 108 m whose area is as large as possible. (If both values are the same number, enter it into both blanks.) m (smaller value) m (larger value) NEED HELP! What is the equation of the axis of symmetry?A) x=-4B) x=4C) y=4D) y= -4 a. A period of maladjustment during which the nonmaterial culture is still adapting to new material conditions b. The physical or technological aspects of our daily lives. c. The viewing of people's behavior from the perspective of their own culture. d. The process by which cultural items spread from group to group or society to society.