Two wheelchair ramps, each 10 feet long, lead to the two ends of the entrance porch of Mr. Bell's restaurant. The two ends of the porch are at the same height from the ground, and the start of each ramp is the same distance from the base of the porch. The angle of the first ramp to the ground is 24°.

Answers

Answer 1

Answer:

It must have an angle of exactly 24°.

Step-by-step explanation:

Answer 2

Answer:

It must have an angle of exactly 24°.

Step-by-step explanation:

I got a 100% on my mastery test


Related Questions

Gonna be sending in quite a few of these lol thanks

Answers

Answer:

A

Step-by-step explanation:

Simply multiply each rows of the firstly stated matrix by the columns of the second and then add each with respect to their location.

find the numbered angles 1 to10​

Answers

Answer:

6

Step-by-step explanation:

im not sure but I think 6 is the answer

What is the gradient of the graph shown?
Give your answer in its simplest form.

Answers

Answer:

m = —1/3

Step-by-step explanation:

There are two clear points shown on the graph

point 1: (0;3)

point 2: (6;1)

[tex]m = \frac{y2 - y1}{x2 - x1} [/tex]

[tex]m = \frac{1 - 3}{6 - 0} [/tex]

[tex]m = - \frac{2}{6} [/tex]

[tex]m = - \frac{1}{3} [/tex]

hi if you need help you can tell me

Answers

Answer: Nope, im currently doing well right now. Thank you though.

Step-by-step explanation:

Hey, i do. actually i’m not sure if theres a way you can check my questions! but i do. please and thanks you!!

The triangle and rectangle belowhave the same area what is the value of w?

(I[m Assuming W =10cm)

Answers

the formula for area of a triangle is 1/2 times the base (4 cm) times the height (5 cm) so the area of the triangle would be 10 cm. to find the area of the rectangle you would divide 10 by 4, which means that w=2.5 cm

2+2 (I have been struggling on this for a long time)

Answers

You might need a maths degree for this one, I believe it’s 4 but don’t quote me on that.
It’s is 4 2+2=4 ez your welcome

Rationalize the denominator and simplify.
6
15 - 3

Answers

Answer:

[tex]a)6 = \frac{6}{1} = 6 \: \: \: b)15 - 3 = \frac{15}{3} = 5[/tex]

How many roots will the function f(x)= -3x³ - x² + 7x + 6 have?

Answers

Answer:

It will have 3 roots

The number of roots in an equation equals the highest power of that equation.

Step-by-step explanation:

PLEASE HELP
What is the volume of the cylinder?
A. 60.0 cm3
B. 120.0 cm3
O C. 188.4 cm
D. 300.0 cm3
E. 942.0 cm

Answers

Answer:

i think E.942 cm³ is answer

Volume = πr²h

so

3.14×5×5×12

= 942 cm²

The angle of elevation to a nearby tree from a point on the ground is
measured to be 38°. How tall is the tree if the point on the ground is 77 feet from the tree? Round your answer to the nearest tenth of a foot if necessary.

Answers

Answer:

Step-by-step explanation:

tan 38 = opp/adj = h/77

h = 77tan38

h = 60.1589932...

h = 60.2 ft

how much solutions does 2x = 2x + 1 have?

Answers

Answer:

no solution

Step-by-step explanation:

hope this helps! :D

have a miraculous day!! <3

4/10 proportional to 6/15

Answers

Answer:

Nooooooo

Step-by-step explanation:

Shabana earns £1900 a month. She is awarded a 1% pay rise. What is her new salary?

Plz answer. No spam links.

Answers

Answer: 1919 will be the final amount

Step-by-step explanation: 1 percent of 1900 is 1900/100=19

add this to 1900

this will get you 1919

brainliest pls

What's The Interest Rate?
I = $200
P = $800
T = 24 months

Answers

I think it is $200 because there is a I next to it so Stands for Intreat rate

The standard error of is the _____. Group of answer choices variance of variance of the sampling distribution of standard deviation of the sampling distribution of difference between the two means

Answers

Answer:

standard deviation of the sample distribution of the difference between these two sample means

Step-by-step explanation:

Pls Find the value of x

Answers

[tex]x + 104 + 28 = 180 \\ (140 + 28 = 132) \\ x = 132[/tex]

[tex]\sf\longmapsto x + 104 + 28 = 180[/tex]

[tex]\sf\longmapsto x = (104 + 28) = 132[/tex]

[tex]\sf\longmapsto x = 132[/tex]

Heres an easy question. Solve this.
[tex]\frac{1}{5}[/tex]y = 10

Answers

Answer:

y=50

Step-by-step explanation:

[tex]\frac{1}{5}[/tex]y=10

 y=10÷[tex]\frac{1}{5}[/tex]

   =50

Simplify. Solve as fast as possible.

Answers

Answer:

-5y

Step-by-step explanation:

[tex]\sqrt{y^2}[/tex] = y if x > 0

-5[tex]\sqrt{y^2}[/tex] = -5y

which of the following angle measure combinations will form a triangle?

A. 47° degrees, 63 degrees, and 70 degrees

B. 160 degrees, 50 degrees, and 150 degrees

C. 90 degrees, 1 degrees, and 88 degrees

D. 182 degrees, 1 degrees, and 2 degrees

Answers

The answer is 182 , 1 , 2 degrees

Mrs. terrance has a large bin of 236 crayons. She divides them equally among four containers.

Answers

236 / 4=59 hoped this helped

How many 1/4 inch cubes does it take to fill a box with width 1 inches, length 3 3/4 inches and height 1 1/2inches?

Answers

Step-by-step explanation:

we need to see how many cubes fit into every dimension.

we can fit 4 cubes along the 1 in width. as 4×1/4 = 1 in.

we can fit 15 cubes along the 3 3/4 in length :

3 3/4 = 12/4 + 3/4 = 15/4

15/4 / 1/4 = 15/4 × 4/1 = 4×15 / 4×1 = 15

we can put 6 cubes on top of each other fit the height of 1 1/2 in

1 1/2 = 2/2 + 1/2 = 3/2 = 6/4

6/4 / 1/4 = ... = 6 (as above - simply 1/4 fits 6 times into 6/4).

so, we have

4 × 15 × 6 = 360

we need 360 cubes to fill the box.

The area of a triangle is 83 square feet. The base is twice the height. Find the height.

Answers

Answer:

166

Step-by-step explanation:

83x2(twice the height)

Mr. Herman's class is selling candy for a school fundraiser. The class has a goal of raising $500 by selling c
boxes of candy. For every box they sell, they make $2.75.
Write an equation that the students could solve to figure out
how many boxes of candy they need to sell.

Answers

500 = 2.75c


500 is your total, 2.75 represents the price of a singular box, and c is how many boxes sold.


Hope this helps!

Answer:

500=2.75c

Step-by-step explanation:

500= 2.75c

Isolate c by dividing 2.75 on each side

500/2.75 =181.818181818 which is about 181.8

So the students need to sell about 181.8 boxes of candy in order to reach their goal of $500.

the local store where tim shops charges a 7% sale tax for clothing complete the table by figuring the cost of jeans after tax is applied the first row is done

Answers

Answer:

$51.36

$77.04 i think

Step-by-step explanation:

Multiply the cost of the number of pairs of jeans by the sales tax amount, 7%.

cost of 2 pairs:   48 + 7/100 x 48 = $51.36

 

cost of 3 pairs:   72 + 7/100 x 72 = $77.04

 

Emple
Six pounds of grapefruit cost $3. What is the cost per pound?
You can use a double number line to help you find ate and
unitate Start with the ratio you know: 53 for 6 pounds
Divide both 53 and 6 pounds by 3 to get 1 for 2 pounds
Then divide 51 and 2 pounds by 2 to find the cost per
pound, which is so. So for 1 pound.
1
Notice that you can also divide 3 by 6 to get the cost per
pound directly
In the example, how much would it cost to buy 3.4 and
5 pounds of grapefruit? Explain how you found your
answers

Answers

Answer:

0.50

Step-by-step explanation:

During a 12-hour car ride, each of 4 family members gets to choose the music for an equal amount of time. Write an equation, where t is time, to find out how long each member of the family is in charge of selecting the music.

Answers

t=12/4
If you need to split it equally just divide the whole by the amount of parts you need

What is the equation of the line that passes through the point (-6,8) and has an undefined slope?​

Answers

Answer:

x = -6

Step-by-step explanation:

Slope is rise over run (change in y divided by change in x), and to have an undefined slope change in x must be zero. The line x = -6 is a vertical line that passes through the point (-6,8).

At a sale this week, a digital camera is on sale for $547.40. This is a 57% discount off of the original price. What is the original price

Answers

Answer:

725.623

Step-by-step explanation:

547.40:?

43 :57

?=547.40×57÷43

A group of students organized a car wash to raise money for a local charity. The students charged $9.99 for each car they watched.In 3.5 hours they washed 14 cars.at that rate how much money could they earn in 8 hours?

Answers

Answer:

First you would divide 12 cars by 3 hours to see how many cars get washed per hour

Then you know that 4 cars get washed in one hour so you multiply it by $5.00 because you want to see how much money they earn in one hour

After you know they earn $20.00 per hour you multiply that by 8 because you want to see how much money they earn in eight hours

So your final answer is $160 for washing cars in 8 hours

Sam has 60 toy cars. 20% of the cars are red.
How many cars are red?
A. 12
B. 20
C. 48
D. 40

Answers

Answer:

A

Step-by-step explanation:

20% of 60 is 12

Hope that helps

Answer (a)







60 divided by 100 =0.6
0.6 x 20= 12
12
Other Questions
What term do art historians use to describe the use of rough brushstrokes and thick dabs of pigment to highlight the uneven surface so it catches the light Do you think that John Muir made an effective argument for saving the redwoods? Why or why not? the students in Jake's class , 6 have visited a zoo and 6 have visited a factory 3 students have visited both a zoo and a factory . How many students have visited a zoo but not a factory ? What is the slope-intercept equation of the line below?5175O A. y= 2x-3O B. y=-2x+3VO C. y= 2x+3O D. y=-2x-3 the religion of judaism differed from the other religions of the time in that it CAN SOMEONE HELP ME PLEASE ASAP!? You have just purchased a brand new Windows 8 computer. What should you do right away with the Administrator account? Eva spent $11.61 downloading songs, and each song cost $1.29. Four students wrote and solved equations to find s, the number of songs that she downloaded. Which student wrote and solved the equation correctly?Sebas work:1 dollar and 29 cents = 11 dollars and 61 cents. S = 10.Aris work:1 dollar and 29 cents = 11 dollars and 61 cents. S = 9.Ericks work:StartFraction s Over 1 dollar and 29 cents EndFraction = 11 dollars and 61 cents. S = 14.98.Daniels work:StartFraction s Over 1 dollar and 29 cents EndFraction = 11 dollars and 61 cents. S = 9. If the gross domestic product is currently 12,443.9 billion dollars and grows by 5 percent, how much will it be next year? What motivated Harriet Tubman to edcape slavery? Why fid she choose to escape alone? f(x) = -2x - 1; Find f (x - 4) The Peloponnesian War resulted in Athens downfall. i need help pls :).... What is the population of Broomfield A one-year-old child learns that the furry animals with bushy tails she sees outside her window are squirrels. Later she sees chipmunks outside the window and believes those are also squirrels. Which Piagetian concept is the child demonstrating Can someone help me with this? Its fairly easy but i genuinely dont remember When a school bus stops to unload children on a divided highway, should the vehicles traveling in the same direction as the bus stop? - Stop until the stop signal on the bus is withdraw. The persons income increased from 27,000 to 40,000 over the last year. What is the percent change I need ideas of what kind of simple motor i can build and how i can build it. The simple motor MUST spin without using your own force. What materials would i use and how would i create it. what would i create 1. Mohamed bought 18 fish for his fish tank. He selected some Guppies and Platies. Mohamed really likes Guppies, so he bought three more than twice the number of Platies. How many Guppies did Mohamed purchase?Enter your answer in the box.Mohamed purchased ____ Guppies for his fish tank.2. The admission fee at the movies is $2.70 for children and $5.25 for adults. On a certain day, a total of 125 people entered the theater and $434.40 was collected. How many adults were are the movies?Enter your answer in the box.There were ____ adults at the movies.3. At the checkout counter a customer purchased a total of 20 cans of cat and dog food. The canned cat food cost $1.23 per can and the dog food cost $2.74 per can. Before taxes the cost for the cat and dog food was $41.21. How many cans of dog food were purchased?Enter your answer in the box.There were ____ cans of dog food purchased.4. There are a total of 25 deer in the front pasture. There are five more does than quadruple the number of bucks. How many bucks are in the front pasture?Enter your answer in the box.There are ____ bucks in the front pasture.